NSW business battery incentives

Cut peak demand.
Store more. Pay less.

New BESS4 and BESS5 pathways are scheduled to support eligible NSW businesses installing commercial battery storage from 1 September 2026. GRIDHUB will help you assess the right system, incentive pathway and delivery plan.

1 Sep 2026Scheduled commencement for BESS4 and BESS5 activities
20 kWh–200 kWhBESS4 pathway for small and medium business systems
200 kWh–10 MWhBESS5 pathway for larger commercial and industrial systems

Choose the right pathway

Two pathways. One practical assessment.

Battery size is only one part of the decision. We review your interval data, tariff, peak demand, operating hours, existing solar and future loads before recommending a system.

BESS4

Small and medium business batteries

More than 20 kWh to 200 kWh

Designed for eligible small and medium commercial sites seeking to reduce peak demand, improve solar self-consumption and gain more control over energy costs.

  • Suitable for many offices, workshops, retail, hospitality and light-industrial sites
  • Standard and battery-only incentive levels may apply
  • Federal incentive stacking may be available for eligible batteries under 100 kWh
BESS5

Commercial and industrial batteries

More than 200 kWh to 10 MWh

For larger commercial, industrial and community-scale sites where load shifting, demand reduction and operational resilience can create material value.

  • Designed around the site’s real load profile and demand charges
  • Additional equipment testing and project requirements apply
  • Final pricing requires engineering, network and site assessment

How GRIDHUB approaches it

We start with your electricity data — not a battery catalogue.

The strongest business case comes from matching usable battery capacity and inverter power to when, where and how your site consumes electricity.

STEP 01

Collect the data

Bills, interval data, operating hours, tariff, solar generation and planned electrical loads.

STEP 02

Model the opportunity

We assess peak-demand reduction, load shifting, solar capture and indicative operating savings.

STEP 03

Confirm eligibility

We check the likely BESS pathway, equipment requirements and available certificate support.

STEP 04

Engineer delivery

Site inspection, protection, network, installation and commissioning requirements are finalised.

What could the incentive be worth?

The incentive is not a fixed rebate percentage. Its value depends on the approved calculation method, usable capacity, project configuration, certificate market price and whether new solar is included.

Get a project-specific estimate
GRIDHUB can model an indicative incentive and savings range after reviewing your energy data.

GRIDHUB incentive estimator

Estimate your NSW business battery incentive.

Model the indicative BESS4 or BESS5 certificate value for a business, commercial facility or primary-production farm. Adjust the market assumptions to explore different scenarios.





Use the manufacturer’s approved usable capacity.


Total rated battery inverter output.




Prefilled planning assumption: $3.00 per PRC.


Used only for a potentially eligible BESS4 system.
Certificate price note: PRC and STC amounts are market-based estimates and are subject to change.

Primary-production farms can be assessed.
Agricultural and primary-production businesses may be eligible where the battery is installed behind the meter at an eligible NSW business site and all scheme, equipment and installation requirements are met.

Indicative result

BESS4 pathway

Estimated combined certificate value
$0
Indicative certificate value using your editable price assumptions.
Capacity used by estimate
Minimum new solar indicated
Demand shifting component
Peak demand reduction capacity
Estimated NSW PRCs
Estimated NSW value
Potential federal STCs
Potential federal value

Enter your system details to see an indicative pathway.

Important: This is an indicative planning tool, not a quote, approval or guarantee of eligibility. It applies the published NSW proposal settings for BESS4/BESS5 commencing 1 September 2026 and the 2026 federal battery STC factor. Final certificate quantities and values depend on the final Rule, approved equipment data, installation date, network factors, accredited provider assessment and market prices. Only one BESS4 or BESS5 activity can be claimed per eligible site.

Initial eligibility guide

What we will check first.

Area Initial check
Site type The site must be a qualifying non-residential NSW site. Data centres are excluded under the published position.
Implementation date The system must meet the applicable commencement and implementation-date rules. Do not order solely on the assumption of eligibility.
Battery capacity BESS4 covers more than 20 kWh to 200 kWh; BESS5 covers more than 200 kWh to 10 MWh under the NSW Government’s published position.
Equipment and installer Approved equipment, accredited installation and applicable Australian Standards are required. Larger BESS5 projects have additional testing requirements.
Solar configuration Standard and lower battery-only incentive levels are proposed. Solar, inverter and battery ratios may affect eligibility and certificate creation.
Previous incentives Prior battery installations or certificate claims at the site may affect eligibility. We will confirm this before relying on an incentive.
Important: This page is a practical starting guide, not an eligibility approval, quote or guarantee of savings. Scheme rules, certificate prices and product requirements can change. Final eligibility must be confirmed for the specific site and installation.

Why GRIDHUB

Commercial energy experience that goes beyond the sales proposal.

GRIDHUB is 100% Australian owned and operated. We bring electrical contracting, power systems infrastructure and practical project-delivery experience to commercial battery assessments.

30 yearsElectrical contracting experience
17 yearsPower systems infrastructure experience
East + WestExperience across both coasts of Australia
One teamAssessment, design coordination and delivery support

Frequently asked questions

Before you invest.

Is this a guaranteed 20%–50% rebate?

No. Market examples may show savings in that range for some projects, but the NSW incentive is certificate-based rather than a fixed percentage. Actual value depends on the project and certificate market.

Can a battery reduce our electricity costs?

Often, yes — particularly where a site has high demand charges, strong daytime solar production, expensive peak usage or flexible loads. The result must be modelled from interval data; savings are not the same for every business.

Can BESS4 be combined with federal battery support?

The NSW Government’s published position allows stacking for eligible BESS4 batteries under 100 kWh, subject to both schemes’ final requirements.

Do we need new solar?

Not necessarily. The published position includes a lower incentive for battery-only installations and a standard incentive where new solar is installed. Project economics and eligibility should be assessed case by case.

What should we send GRIDHUB?

Start with recent electricity bills and, if available, 12 months of interval data. Tell us about operating hours, existing solar, major equipment and any planned EV charging or expansion.

Scheme information checked against the NSW Government Peak Demand Reduction Scheme information. Last reviewed August 2026.

Turn your electricity data into a battery business case.

Start with a no-obligation pathway check. We will identify the information needed to confirm sizing, savings and likely incentive support.

Start my assessment